Six systems. One building, flat by flat.
Lettings, the rent ledger, the repairs desk, meters, certificates and accounts stay where they are. What each knows about a flat meets on one drawing of the building.
Are spend and progress in step?
The tower is 58 per cent built, and 66 per cent of its budget is spent.
What we connect
Your lettings, your rent ledger and your repairs desk stay where they are. We join their records, add what happens outside your buildings, and put models to work on all of it.
Lettings, the rent ledger, the repairs desk, meters, certificates and accounts stay where they are. What each knows about a flat meets on one drawing of the building.
The weather, supplier lead times and interest rates sit beside your own records. Models read all of it and point to the next step.
Inside a building
Lettings, rent, repairs and energy are usually four separate lists. Joined, they sit on the same flats, and one list explains another.

Block B · 20 flats
Which flats are let, and which stand empty.
Block BLettings
What it showsFlat 8 has stood empty for 21 days.
Block B · 20 flats
Which rents are in, and which are late.
Block BRent
What it showsFlat 4 is late for the second month running.
Block B · 20 flats
Where a request is open, and how long it has waited.
Block BRepairs
What it showsThree heating requests share one riser. One visit to the plant room may close all three.
Block B · 20 flats
The heat each flat has used this winter.
Block BEnergy
What it showsFlat 8 is empty, and still heated.
Flat 12All four lists
Flat 8All four lists
Flat 4All four lists
Plant roomAll four lists
Point at a flat to open its file.Tap a flat to open its file.
Block BLettings
What it showsFlat 8 has stood empty for 21 days.
Block BRent
What it showsFlat 4 is late for the second month running.
Block BRepairs
What it showsThree heating requests share one riser. One visit to the plant room may close all three.
Block BEnergy
What it showsFlat 8 is empty, and still heated.
Explore a demo
Explore a report built for a residential developer. See its buildings, its sales and the work behind each handover in one connected view.
One place
Five parts of the business, one set of records. Open any one and see what the others already know about it.
Site reports + cost plan + accounts
Spend moved ahead of progress in April, when the façade order was paid for early.
31 of the tower’s 96 homes are already reserved
From January to March the share built and the share of the budget spent rise together. From April the spend runs about eight points ahead: in July the tower is 58 per cent built and 66 per cent of the budget is spent.
Lettings + rent ledger
Block C holds eight of the fourteen empty homes.
Some empty homes are still being heated
Block A has 44 of 48 homes let, Block B 18 of 20, and Block C 52 of 60.
Rent ledger + lettings
Eight tenancies are late. Two of them were also late last month.
Three late tenancies have a repair request open
Requests + repair records
Three of the five overdue requests involve heating, all in Block B. A shared category, not a proven cause.
Block B also uses the most heat on the estate
Meters + lettings
Block B uses 31% more heat than last winter. The other two blocks are level.
Its three heating requests are still open
Block A and Block C use about the same heat as last winter. Block B uses 171 kilowatt hours per square metre against 131 last winter, 31 per cent more.
Ask in your own words
We build an assistant on your own records and shape it to each role: the questions it expects, the figures it may show, the words it uses.
Ask as
Asset manager
Which empty homes are costing us the most?
Your assistant
The eight in Block C. Six have stood empty for more than a month, and all eight are still being heated.
Read from Lettings · rent ledger · meters
Property manager
What is behind the heating requests in Block B?
Your assistant
All three are on the same riser, and Boiler 2 was last serviced 14 months ago. A shared pattern, not a proven cause.
Read from Requests · repair records · certificates
Development manager
Are we still on budget for the tower?
Your assistant
Spend is 8 points ahead of progress: 66% spent, 58% built. The gap opened in April, when the façade order was paid for early.
Read from Site reports · cost plan · accounts
Working together
01Meet
Bring a decision your reports cannot answer today. We explore it together and show you examples.
First meetingFree
A clear next step
02Agree
We agree the sources, the measures and the views in writing. Work starts once the scope is signed.
Work starts
03Build
We connect your sources and build the views. You confirm the figures match your business.
Your view
Checked with you
04Develop
New questions will come up. We review what to add or change, and the system grows with you.
As you grow
Your next question
Your turnStage 01 starts here
The first meeting is free and comes before any commitment.
Questions
Your systems, your team and how we start.
We start by reviewing the records and systems relevant to your questions. Each connection is assessed for your project; the sources and method are agreed before building.
Ask this in your enquiryThe system is built around your buildings: your measures, views and user access are defined with you.
Ask this in your enquiryWhere your records allow it. A project under construction and a building in use keep different records; we agree which belong in the system for your project, and show the gap where they do not meet.
Ask this in your enquiryA view can be built for people outside your team, showing only what you agree to share with them. Who may see each view, and who may change it, is agreed for each project.
Ask this in your enquiryNo. An assistant is developed for your system, on your own records, and what it may answer for each role is agreed with you.
Ask this in your enquiryThe update schedule depends on what you need and what the source systems can support. We agree the timing for each relevant source, rather than promise that everything is real time.
Ask this in your enquiryStart with a free introductory meeting to explore your question and see relevant examples. The work and price depend on the agreed scope. Building starts once the project is agreed and signed.
Ask this in your enquiryLet’s start with your buildings
Tell us about your buildings and the question you need to answer.